The dredging would remove silty sediment from a 500-foot-wide channel extending from the deep water in Penobscot Bay to Mack Point as well as a 1,500-foot-wide turning area near the piers.
The dredging would remove silty sediment from a 500-foot-wide channel extending from the deep water in Penobscot Bay to Mack Point as well as a 1,500-foot-wide turning area near the piers.